Home
Product Directory
Manufacturing & Processing Machinery
Building Material Making Machinery
Brick Making Machine
2020 Cement/Concrete Automated Hydraulic Vibration Curbstone/Pavement/Interlocking/Solid/Hollow/Paving Block/Brick Making/Molding Machine with Qt12-15/AAC
US$19,800.00-25,000.00 | 1 Piece (MOQ) |
Port:
Qingdao, China
Production Capacity:
1500sets/Year
Payment Terms:
L/C, T/T, Western Union, Money Gram
Linyi Dude Imp & Exp Co., Ltd.
Shandong, China
Last Login Date:
Jul 09, 2024
Business Type:
Manufacturer/Factory, Trading Company
Main Products:
Brick Molding Machine, Brick Making Machine, Block Making Machine, Stone Coated Roof Tile Machine, Cement Roof Tile Making Machine, Spare Parts for The Machinery, Forklift, Wheel Loader, Truck, Farm Tractor
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
QT10-15
Certification
CE, ISO, Soncap
Customized
Customized
Automatic Grade
Type
Vibration Molding
Weight of Host Machine
7.5t
Vibration Force
88kn
Workshop Area
250-300m2
Mixer Model
Js500
Pallet Size
900*680*25
Voltage
380/415/440
400*200*200
8400PCS /Day
Warranty
1 Year International Warranty
Cycle
15-18 Seconds for One Sheet
Rated Pressure
21MPa
Trademark
dude
Transport Package
Suitable for The Sea Transportation
Specification
3800*2000*2510MM
Origin
Shandong China +
HS Code
8474802000
Product Description
DUDE Machinery is one of the most professional manufacture for the block making machine in Africa Market with 9 years since year 2011.
2.QT10-15 Concrete block making machine technical parameter
3.Theoretical workshop area :200m2 , Need about 3-4workers.
office.curing and stacking area to arrange according to demands
4.QT10-15 concrete block making machine production capacity
.
5.Raw material formula
1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.
6.Block curing
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be
taken after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
6.Contact info
2.QT10-15 Concrete block making machine technical parameter
Overall size | 5300*2050*2700mm | Host machine power | 56KW | Molding period | 12-20S |
Pallet Size | 1100×850×25mm | Vibration Force | 90-110KN | Pallet quantity | 1500pcs |
3.Theoretical workshop area :200m2 , Need about 3-4workers.
office.curing and stacking area to arrange according to demands
BLOCK SAMPLE | CAPACITY | MACHINE MODEL | ||||
QT4-15 | QT6-15 | QT8-15 | QT10-15 | QT12-15 | ||
960*550 | 900*700 | 960*850 | 1100*850 | 1380*880 | ||
400*200*200mm | pcs/mold | 4 | 6 | 8 | 10 | 12 |
Pcs/hr | 960 | 1440 | 1920 | 2400 | 2880 | |
Pcs/day | 7680 | 11520 | 15360 | 19200 | 23040 | |
400*100*200mm | pcs/mold | 8 | 12 | 16 | 20 | 24 |
Pcs/hr | 1920 | 2880 | 3840 | 4800 | 5760 | |
Pcs/day | 15360 | 23040 | 30720 | 38400 | 46080 | |
400*150*200mm | pcs/mold | 6 | 8 | 10 | 14 | 16 |
Pcs/hr | 1440 | 1920 | 2400 | 2520 | 2880 | |
Pcs/day | 11520 | 15360 | 19200 | 20160 | 23040 | |
230*110*75mm | pcs/mold | 20 | 23 | 33 | 40 | 50 |
Pcs/hr | 4800 | 5520 | 7920 | 9600 | 12000 | |
Pcs/day | 38400 | 44160 | 63360 | 76800 | 96000 | |
200*100*60mm | pcs/mold | 16 | 20 | 24 | 27 | 33 |
Pcs/hr | 2880 | 3600 | 4320 | 4860 | 5940 | |
Pcs/day | 23040 | 28800 | 34560 | 38880 | 47520 | |
225*113*60mm | pcs/mold | 14 | 15 | 21 | 24 | 30 |
Pcs/hr | 2520 | 2700 | 3780 | 4320 | 5400 | |
Pcs/day | 20160 | 21600 | 30240 | 34560 | 43200 | |
200*165*60mm | pcs/mold | 10 | 12 | 15 | 18 | 21 |
Pcs/hr | 1800 | 2160 | 2700 | 3240 | 3780 | |
Pcs/day | 14400 | 17280 | 21600 | 25920 | 30240 |
4.QT10-15 concrete block making machine production capacity
Size(mm) | Pcs/Mould | Pcs/ Hr | Pcs/ 8 Hr |
450*225*225mm | 10PCS | 2400 | 19200 |
200*100*80mm | 33PCS | 5400 | 43200 |
200*100*60mm | 33PCS | 5400 | 43200 |
400*150*225mm | 16pcs | 3840 | 30720 |
1.We can design mould as per client requests 2.Capacity above is indicative only,The actual capacity varies with operator efficiency and material quality etc |
5.Raw material formula
1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.
6.Block curing
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be
taken after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
6.Contact info
Send your message to this supplier
People who liked this also liked