Home
Product Directory
Manufacturing & Processing Machinery
Building Material Making Machinery
Brick Making Machine
Factory Price Cement/Concrete Curb/Paver/Solid/Hollow/Pavement/Paving/Interlocking Block/Brick Making/Forming Machine with Qt4-18/AAC
US$22,500.00 - 90,000.00 | 1 Piece (MOQ) |
Port:
Qingdao, China
Production Capacity:
50sets/Month
Payment Terms:
L/C, T/T, Western Union, Money Gram
Linyi Dude Imp & Exp Co., Ltd.
Shandong, China
Last Login Date:
Jul 09, 2024
Business Type:
Manufacturer/Factory, Trading Company
Main Products:
Brick Molding Machine, Brick Making Machine, Block Making Machine, Stone Coated Roof Tile Machine, Cement Roof Tile Making Machine, Spare Parts for The Machinery, Forklift, Wheel Loader, Truck, Farm Tractor
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
QT9-15
Certification
CE, ISO
Customized
Customized
Automatic Grade
Type
Vibration Molding
Vibration Force
90-110kn
Trademark
DUDE
Transport Package
Suitable for The Sea Transportation
Specification
5300*2050*2700mm
Origin
China
HS Code
8474809090
Product Description
DUDE Machinery is one of the most professional manufacture for the block making machine in Africa Market with 9 years since year 2011.
Customer Shipping Details
2.QT10-15 Concrete block making machine technical parameter
3.Theoretical workshop area :200m2 , Need about 3-4workers.
office.curing and stacking area to arrange according to demands
4.QT10-15 concrete block making machine production capacity
.
5.Raw material formula
1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.
6.Block curing
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be
taken after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
7.Contact Info
Customer Shipping Details
2.QT10-15 Concrete block making machine technical parameter
Overall size | 5300*2050*2700mm | Host machine power | 56KW | Molding period | 12-20S |
Pallet Size | 1100×850×25mm | Vibration Force | 90-110KN | Pallet quantity | 1500pcs |
3.Theoretical workshop area :200m2 , Need about 3-4workers.
office.curing and stacking area to arrange according to demands
BLOCK SAMPLE | CAPACITY | MACHINE MODEL | ||||
QT4-15 | QT6-15 | QT8-15 | QT10-15 | QT12-15 | ||
960*550 | 900*700 | 960*850 | 1100*850 | 1380*880 | ||
400*200*200mm | pcs/mold | 4 | 6 | 8 | 10 | 12 |
Pcs/hr | 960 | 1440 | 1920 | 2400 | 2880 | |
Pcs/day | 7680 | 11520 | 15360 | 19200 | 23040 | |
400*100*200mm | pcs/mold | 8 | 12 | 16 | 20 | 24 |
Pcs/hr | 1920 | 2880 | 3840 | 4800 | 5760 | |
Pcs/day | 15360 | 23040 | 30720 | 38400 | 46080 | |
400*150*200mm | pcs/mold | 6 | 8 | 10 | 14 | 16 |
Pcs/hr | 1440 | 1920 | 2400 | 2520 | 2880 | |
Pcs/day | 11520 | 15360 | 19200 | 20160 | 23040 | |
230*110*75mm | pcs/mold | 20 | 23 | 33 | 40 | 50 |
Pcs/hr | 4800 | 5520 | 7920 | 9600 | 12000 | |
Pcs/day | 38400 | 44160 | 63360 | 76800 | 96000 | |
200*100*60mm | pcs/mold | 16 | 20 | 24 | 27 | 33 |
Pcs/hr | 2880 | 3600 | 4320 | 4860 | 5940 | |
Pcs/day | 23040 | 28800 | 34560 | 38880 | 47520 | |
225*113*60mm | pcs/mold | 14 | 15 | 21 | 24 | 30 |
Pcs/hr | 2520 | 2700 | 3780 | 4320 | 5400 | |
Pcs/day | 20160 | 21600 | 30240 | 34560 | 43200 | |
200*165*60mm | pcs/mold | 10 | 12 | 15 | 18 | 21 |
Pcs/hr | 1800 | 2160 | 2700 | 3240 | 3780 | |
Pcs/day | 14400 | 17280 | 21600 | 25920 | 30240 |
4.QT10-15 concrete block making machine production capacity
Size(mm) | Pcs/Mould | Pcs/ Hr | Pcs/ 8 Hr |
450*225*225mm | 10PCS | 2400 | 19200 |
200*100*80mm | 33PCS | 5400 | 43200 |
200*100*60mm | 33PCS | 5400 | 43200 |
400*150*225mm | 16pcs | 3840 | 30720 |
1.We can design mould as per client requests 2.Capacity above is indicative only,The actual capacity varies with operator efficiency and material quality etc |
5.Raw material formula
1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.
6.Block curing
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be
taken after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
7.Contact Info
Send your message to this supplier
People who liked this also liked